Preparations have commenced: Laver Cup will be an exceptional event even from the perspective of the stands layout
september 30, 2016
Works related to the court preparation and design of the stands started, with the objective to maximize the sport experience and the number of spectators in O2 Arena.
The works are already underway – take a look at some of the pictures. Mr. Steve Zacks, the Laver Cup Managing Director, presented the concept in O2 Arena on September 27. Together with him, the works are personally supervised by the following top managers: Robert Schaffer, O2 Arena, Vladimír Šafařík, Česká Sportovní, and Tom Larner, Laver Cup.